Clients always want to know: "Bila boleh siap?" — and it's a fair question. The honest answer depends on the type of website and how prepared you are when we start. Here's a realistic breakdown.
Timeline by Website Type
The fastest option. With your content and branding ready, we can design, build, and deploy a high-converting landing page in under a week.
Includes discovery, design, development, content integration, and testing. If content is ready from day one, we aim for 7–10 working days.
Depends on the number of products and payment integrations. A store with 20 products and standard FPX payments takes around 2 weeks. Complex catalogues or custom checkout flows take longer.
Booking systems, portals, dashboards. These require a detailed scoping phase before development starts, and timelines vary significantly based on complexity.
What Causes Delays?
In our experience, the main reasons projects run late are almost always on the client side — and that's not a criticism, just a reality of how projects work:
- Content not ready: We can't build pages without your text, photos, and logo. Having these ready before we start cuts the timeline in half.
- Slow feedback rounds: If reviews take 3–4 days per round, a 2-week project becomes a 6-week project.
- Scope changes mid-project: "Can we also add a booking system?" mid-build always delays delivery.
- Domain / hosting access delays: We need login access to your domain registrar to go live. Sorting this out in advance saves days.
How to Speed Things Up
Here's what we ask clients to prepare before we kick off:
- Your logo (PNG with transparent background, or vector)
- Photos of your business, team, or products (high resolution)
- Written content for each page (or budget for copywriting)
- Your domain login credentials
- Examples of websites you like the look of
Have a deadline in mind? Tell our AI consultant your timeline and we'll confirm if it's achievable and what we'd need to make it happen.